A customer wants to boot from SAN with their IBM BladeCenter infrastructure. What is required for the customer to be able to perform this? ()
A、4GB Modular Flash Drive for each Blade Server and Dual 15.8GB 2.5 Solid State Drive for each Blade Server
B、Cisco Intelligent Gb Ethernet Switch Module and IBM BladeCenter Copper Pass-thru Module
C、Fibre Channel Expansion Card for each Blade Server and Fibre Channel SAN Switch Module
D、Cisco Intelligent Gb Ethernet Switch Module and Dual 15.8GB 2.5 Solid State Drive for each Blade Server
在word2003中,图片环绕方式的设置有()
A、嵌入型
B、滚动型
C、四周型
D、紧密型
http://IP:PORT/app/module/rest/user/0001该请求中,app为()
A、场景名
B、模块名
C、应用项目名称
D、域名
Select 3 features of IBM’s CoolBlue Energy Management Innovation:()
A、IBM Active Energy Manager, Calibrated Vectored Cooling, and Water Chilled Door eXchanger
B、IBM Active Energy Manager, Front Door Heat eXchanger, and Calibrated Vectored Cooling
C、Power Configurator, Calibrated Vectored Cooling, and Rear Door Heat eXchanger
D、Thermal Diagnostics, Front Door Heat eXchanger, and Rear Door Heat eXchanger
有如下程序: #include main() { int x=0x13; printf("INT:%d",x+1); } 程序运行后的输出结果是( )。
A、INT:14
B、INT:13
C、INT:12
D、INT:20
IT服务工程师需要阅读的文档,不包含的内容是()。
A、CASE监控情况通报
B、事件录入规范情况
C、服务级别协议模扳
D、服务项目管理日志