A company plans to deploy a two-enclosure, 23-core Power 780 system with AIX, IBM i and Linux in thefollowing configuration: 3 AIX partitions with dedicated network and disk adapters; 1 native IBM i partition acting as a host1 hosted IBM i partition; 2 hosted Linux partitions. Which configuration will provide boot disk capability to all partitions?()
A、Use dual-split backplane in both enclosures for the three AIX partitions and the IBMi partition.
B、Put each partition on a dedicated controller using the triple-split backplane option in both enclosures.
C、Use the triple-split backplane option in one enclosure for the AIX partitions, and the default dual-split backplane for the IBMi partition in the second enclosure.
D、Use the triple-split backplane option in one enclosure for the AIX partitions, and the non-split backplane mode in the second enclosure for the IBMi hosting partition.
Which of the following includes Active Memory Sharing (AMS)?()
A、PowerHA Enterprise Edition
B、PowerVM Enterprise Edition
C、VMControl Enterprise Edition
D、Systems Director Enterprise Edition
在Excel2010的一个工作表的某一个单元格中,若要输入公式2008-4-5,则正确的输入为()。
A、2008-4-5
B、=2008-4-5
C、‘2008-4-5
D、2008-4-5
You perform the following activities during the database upgrade from Oracle Database 10g to Oracle Database 11g: 1. Capture plans for a SQL workload into a SQL Tuning Set (STS) before upgrade. 2. Load these plans from the STS into the SQL plan baseline immediately after the upgrade. What is the reason for performing these activities? ()
A、to minimize plan regression due to the use of a new optimizer version
B、to completely avoid the use of new plans generated by a new optimizer version
C、to prevent plan capturing when the SQL statement is executed after the database upgrade
D、to keep the plan in the plan history so that it can be used when the older version of the optimizer is used
应该在()阶段制定系统测试计划。
A、需求分析
B、概要设计
C、详细设计
D、系统测试
以下内容哪个是路由表中所不包含的()。
A、目标地址
B、源地址
C、下一跳
D、子网掩码